Every surface
tells the truth
about who
paved it.
Hot-Mix Asphalt · Parking Lots · Driveways · Commercial Sites
We lay asphalt the way old roads were meant to be built — hot mix pressed flat under ten-ton rollers until the surface reads like a single unbroken sheet of slate. Property managers, HOA boards, and general contractors trust our crew to show up on schedule and grade to spec.
Westfield Estates, Columbus OH
A driveway that was cracking from the base up — not the surface.
The homeowner had patched the same section three times in four years. We cored it. The subbase was failing — frost heave had buckled the aggregate and no surface patch was ever going to hold. We tore out 1,400 sq ft of existing asphalt, regraded the subbase with compacted #57 stone, and laid 3 inches of 411 hot mix in a single pass under a 10-ton steel drum roller. Edges cut clean with a plate compactor. Zero joints. One continuous surface.
Surface Area
1,400 sq ft
Material
3" 411 Hot Mix
Crew
4 men, 1 day
Warranty
5 years
“They showed up at 6:45, finished before noon, and cleaned the street before they left. I've never had a contractor do that.”
David Kowalski
Homeowner, Columbus OH
Calvary Bible Church, Dublin OH
18,000 square feet of potholed asphalt serving 400 cars every Sunday.
The congregation had been filling potholes with cold patch every spring for six years. Liability was mounting. We performed a full condition survey — 40% of the lot was overlay-eligible, 60% required full-depth reclamation. We sequenced the work across two weekday nights to keep Sunday service uninterrupted. 68 tons of 448 surface mix laid at 280°F, steel-drum compacted to 95% density per ODOT spec. New ADA-compliant striping and wheel stops installed the following morning.
Surface Area
18,000 sq ft
Material
68 tons 448 Surface Mix
Schedule
2 nights, zero downtime
Scope
60% FDR / 40% Overlay
“We've used three paving contractors in ten years. Blacktop is the first one that actually read our site conditions before quoting. The price was fair and the work was exactly what the spec said it would be.”
Pastor Marcus Webb
Facilities Director, Calvary Bible Church
Not ready to call? Vet the crew first.
Download our full Paving Specification Sheet — mix designs, compaction standards, drainage tolerances, and warranty terms. If you're a GC who needs a paving sub that can hit ODOT spec on a commercial job, start here.
Meridian Crossing, Westerville OH
A 74,000 sq ft retail plaza. Twelve tenants. One contractor who had to get it right.
The property management group had been losing tenants over ADA complaints and vehicle damage claims from pothole impacts. The lot hadn't been touched in eleven years. We brought in a milling machine to reclaim the top 2 inches across the full footprint, re-graded all drainage swales to eliminate standing water at three chronic failure points, and laid 280 tons of 448 surface mix in four coordinated pours over three days — maintaining access to anchor tenants throughout. Final striping, stop bars, and ADA markings applied at 72 hours post-cure.
Surface Area
74,000 sq ft
Material
280 tons 448 Surface Mix
Duration
3 days, phased access
Scope
Full mill-and-overlay + drainage
“Twelve tenants, zero complaints during construction. The lot looks better than it did when the building was new. Our property value went up — I can say that without exaggerating.”
Renee Okafor
VP Property Operations, Meridian Group
Tell us about your surface. We'll tell you what it needs.
We respond within one business day with a preliminary scope and ballpark range — no obligation, no sales pressure. If you want us on site for a full condition assessment, we'll schedule that too at no charge.
Licensed, bonded & insured — Ohio #PAV-2009-0847
ODOT-certified mix designs on all commercial work
5-year workmanship warranty, written at signing
Serving Central Ohio since 2009 — 400+ completed projects